As Keita wrote here, the TMSX initial alignment is done.
I need to catch up on posting my TMSX pictures, so here are my ResourceSpace collections (date in title):
LHO TMSX 4Sept2013 - IAS alignment, upper mass cabling, and pitch balancing
LHO TMSX 30Aug2013 - reattaching ISC cables to ISC table, optics covered with Alpha wipes, and offse
LHO TMSX 30Aug2013 - how to turn the telescope 180 degrees, and move to the test stand from the lab
LHO TMSX 26Aug2013 - upper structure move and first attempt at cable routing
LHO TMSX 21Aug2013 optics contamination and OSEM testing
LHO TMSX 16Aug2013 on test stand - cables and safety hardware