Reports until 16:03, Thursday 14 March 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:03, Thursday 14 March 2024 (76391)
Ops Day Shift End

TITLE: 03/14 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY: The morning was taken up by reverting IM and PR moves over the last few days, then ISCT1 work. Since then we have been trying to relock but an earthquake has been making this tricky. Starting to get past DRMI more consistently, currently powering up.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:06 FAC Karen OptLab n Tech clean 15:31
15:40 - Mitchell LVEA n HAM6 pictures 15:53
15:43 Vac Jordan LVEA n HAM6 pictures as well 15:53
15:55 VAC Chris Outbuildings n SS unistrut hunt 16:47
16:35 FAC Tyler LVEA n Parts hunt 16:36
16:58 ISC Sheila, TJ, Jennie LVEA - ISCT1 LOCAL Alignment on ISCT1 19:22
17:28 SQZ Dhruva, Nutsinee LVEA - SQZT7 LOCAL Homodyne work 20:05
17:33 FAC Mitchell EX, EY n FAMIS tasks 18:13
18:34 SQZ Nutsinee, Dhruv, Naoki SQZ table y(local) Squeezing even more 22:51
19:04 RUN Gabriele entire site n Running so far so fast 20:53
20:10 ISC Sheila, Oli LVEA local ISCT1 alignment 20:53
20:58 VAC Travis LVEA n Measurement 21:01