Displaying report 1-1 of 1.
Reports until 12:32, Friday 15 March 2024
H1 SQZ
daniel.sigg@LIGO.ORG - posted 12:32, Friday 15 March 2024 (76427)
SQZ TRANS PD Readback Saturation

The readback of the broadband PD in transmission of the SHG (SQZ-SHG_TRANS_DC) was electronicslly saturating. We switched the gain from 10x to 1x on the generic PD interface box and adjusted the transimpedance gain accordingly. The readback now shows ~1.2V and 7.2mW.

Displaying report 1-1 of 1.