We made an attempt at placing a clean room over BSC 3 only to realize that the work platform configuration was incorrect. This required relocation of the E-module from inside the beer garden to the east side of BSC 3 and some slight modification of the work platform. This also required relocating the gowning room from the west side to the east side of the small clean room currently being ocuppied by SUS. Tyler assisted Lisa A. with assembly for most of the day.