The power glitched visibly in the control room for half a second. We lost the frame builder immediately, and then all the front ends slowly but surely crashed in its wake. And so ends a night of work at LHO. We won't begin to resurrect until the storms planned for this evening pass. We really should have the front ends and related systems on some sort of UPS. At least to with stand 10 seconds without power.