betsy.weaver@LIGO.ORG - posted 12:41, Tuesday 19 March 2024 (76522)
Walk thru complete after Tues Maint per T1500386

(Betsy, Camilla)

We performed an LVEA closeout walk thru after today's Tues Maint window (and the previous weeks of vent and pump work).

Nutsinee helped tidy up the Squeezer rack power cords and auxilliary equipment which was plugged in and around the floor.  There is still a spectrum analyzer plugged in and powered up at the rack since there will be some more work there throughout the Eng Run starting tomorrow.

All HEPIs, cleanrooms, and ISC tables in proper shape.  Camilla unplugged the high lift which was still on a charger.

The high bay door to the CER on the way into the LVEA is still open, had been open during O4a legacy of some old HVAC issue.  However, Fil reports that the HVAC issue should be solved so we have closed the door now (to aid in any further electronic noise near the inner LVEA walls).

Paging system and phones all unplugged.

Oli turned off the WIFI hubs remotely.