Reports until 16:12, Wednesday 20 March 2024
LHO General
corey.gray@LIGO.ORG - posted 16:12, Wednesday 20 March 2024 (76559)
Wed EVE Ops Transition

TITLE: 03/20 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: Corey
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 13mph Gusts, 10mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.19 μm/s
QUICK SUMMARY:

Engineering Run #16 (ER16) started this morning and Oli handed over an H1 in NLN with Camilla doing a Squeezer measurement and there is a possibility we may try to "squeeze" in a few other measurements (i.e. no squeezing quiet time) before the 6pm target for Observing.