Reports until 16:12, Friday 22 March 2024
LHO General
ryan.short@LIGO.ORG - posted 16:12, Friday 22 March 2024 (76638)
Ops Day Shift Summary

TITLE: 03/22 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing
INCOMING OPERATOR: Tony
SHIFT SUMMARY: H1 remained locked all shift, current stretch is at 14 hours (lock clock in control room is inaccurate for this lock), which made for lots of commissioning opportunities.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:38 SQZ Julian Opt Lab Local SHG measurements 17:40
16:50 ISC Camilla, Jennie CR - Noise budget injections 18:14
17:25 ISC Sheila, Jennie LVEA - Plugging in freq injection cable 17:38
20:01 SQZ Julian Opt Lab Local SHG measurements 22:54
21:06 VAC Gerardo MX - Picking up cable trays 22:10
21:48 SQZ Sheila, Naoki LVEA - SQZT0 Local Realign CLF fiber on-table 22:20
21:50 CAL Francisco PCal Lab - Dropping off parts 22:03