Displaying report 1-1 of 1.
Reports until 16:01, Monday 25 March 2024
LHO General
ryan.short@LIGO.ORG - posted 16:01, Monday 25 March 2024 (76680)
Ops Day Shift Summary

TITLE: 03/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Locked most of the day; several commissioning activities ongoing with observing periods in between.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:17 FAC Karen Opt/Vac Lab - Technical cleaning 15:51
16:06 FAC Chris FCES - Safety checks 16:42
16:10 PEM Robert LVEA - Set up for PEM injections 16:31
16:17 FAC Karen MY - Technical cleaning 17:30
16:24 FAC Kim MX - Technical cleaning 17:46
21:07 TCS TJ Opt Lab - Looking for parts 21:56
21:26 PEM Robert LVEA - Set up for PEM injections 22:22
Displaying report 1-1 of 1.