TITLE: 03/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Locked most of the day; several commissioning activities ongoing with observing periods in between.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:17 | FAC | Karen | Opt/Vac Lab | - | Technical cleaning | 15:51 |
16:06 | FAC | Chris | FCES | - | Safety checks | 16:42 |
16:10 | PEM | Robert | LVEA | - | Set up for PEM injections | 16:31 |
16:17 | FAC | Karen | MY | - | Technical cleaning | 17:30 |
16:24 | FAC | Kim | MX | - | Technical cleaning | 17:46 |
21:07 | TCS | TJ | Opt Lab | - | Looking for parts | 21:56 |
21:26 | PEM | Robert | LVEA | - | Set up for PEM injections | 22:22 |