H1 TCS
camilla.compton@LIGO.ORG - posted 13:22, Tuesday 26 March 2024 - last comment - 15:19, Monday 01 April 2024(76715)
CO2X Beam Scan

TJ, Camilla, WP 11746, LLO did in LLO#14419

We blocked the beam path going into vaccunm (downstream of the BS) and the FLIR path. Photo during set A,B and C attached. 
Mounted a razor blade to a 25mm transition stage.
At 1mm increments we measured the power transmitted to our PD (channel H1:TCS-ITMX_CO2_LSRPWR_MTR_OUTPUT). 
 
We repeated this 3 times:
Data attached, still to be analyzed - use Matlab code from LLO#14419.
 
Data set A and B:
BS to Razor 8”
Razor to center of annular mask: 2 3/8”
Razor to center of center mask: 3 1/2”
Annular Mask to Mirror: 18 3/8“
 
Data set C:
BS to annular Mask = 10”
Razor to annular Mask = 10 7/8”
Razor to central Mask = 9 1/2”
Rasor to mirror = 5 1/2”
 
We attempted to use the Wincam beamscanner (as in 74914) to measure the beam before the periscope, setup in attached photo. the beam was too large so we need to shorten our beam path. Left in the two downstream mirrors and left the FLIR path blocked so we can continue this work on a future Tuesday. 
Images attached to this report
Non-image files attached to this report
Comments related to this report
camilla.compton@LIGO.ORG - 15:19, Monday 01 April 2024 (76849)

Using Matlab code from LLO#14419 with edit to parameter x = 4:1:26

  • Data set A plot: No mask. Razor blade 2 3/8" (60mm) downstream of the center of the annular mask: beam radius = 10.28mm 
  • Data set C plot: No mask. Razor blade 10 7/8” (275mm) upstream of the center of the annular mask: beam radius =  10.81mm
Images attached to this comment