corey.gray@LIGO.ORG - posted 16:01, Tuesday 26 March 2024 (76717)
Ops Day Shift End

TITLE: 03/26 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Maintenance day activities concluded just before noon and we made it back to low noise at 21:11 UTC. Since then there have been detchar injections, PEM inj, PRM/PR2 spot centering.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:01 FAC Ken osb roof n Catwalk lights 18:14
15:05 SUS Jeff.dave.jonathan cr n Triples WD model changes 19:02
15:07 FAC Karen EY n Tech clean 16:28
15:09 FAC Kim, Emma FCES n Tech clean 17:08
15:22 FAC HFD Xarm n Tumbleweed burning, no Xarm access!! 15:24
15:40 LAS camilla LVEA YES Laser HAZARD!! 18:49
15:42 ias jason.ryanC.tyler LVEA n FARO 18:39
15:49 ee fil.marc EY n accelerometers 16:56
15:50 tcs tj.camilla LVEA YES TCSx Table beam profiling 18:27
15:50 vac gerardo.janos LVEA n LOUD purge air +x-beam manifold test 17:51
16:02 pem robert ex n PEM Injections (set-up) 20:12
16:16 sus rahul cr n etmX+Y charge meas 18:00
16:17 ee fernando ex.ey.lvea n oplev cabling labeling 18:08
16:25 vac norco EY n LN2  @cp7 18:49
16:58 vac norco Corner n LN2 @cp1 19:16
17:25 fac kim LVEA N Technical cleaning 18:36
17:52 sqz nutsinee, Daniel sqz.rack n SQZ rack meas 18:59
17:54 sei jim LVEA n cps checks in CR & lvea 18:15
18:03 sus jeff cr n EX esd  +charge offset 18:51
18:21 epo cassidyand class! CR n Field trip!!! 18:31
18:30 VAC Gerardo LVEA - Viewport notes 19:10
18:32 CDS Marc EY n Check on acc. cable 19:16
18:38 VAC Janos FCES n Purge 18:39
19:02 SQZ Nutsinee LVEA n SQZ rack meas. 19:26
20:13 PEM Robert, Marc EY n Acc. cable check 21:20
21:46 INJ TJ CR n Run detchar safety inj 21:47
21:47 ISC Jenny CR n PRM moves 23:47
22:52 PEM Robert LVEA n Turn on shaker 23:02
22:59 SQZ Nutsinee, Naoki FCES yes Center diode 00:59