TITLE: 03/26 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Maintenance day activities concluded just before noon and we made it back to low noise at 21:11 UTC. Since then there have been detchar injections, PEM inj, PRM/PR2 spot centering.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:01 | FAC | Ken | osb roof | n | Catwalk lights | 18:14 |
| 15:05 | SUS | Jeff.dave.jonathan | cr | n | Triples WD model changes | 19:02 |
| 15:07 | FAC | Karen | EY | n | Tech clean | 16:28 |
| 15:09 | FAC | Kim, Emma | FCES | n | Tech clean | 17:08 |
| 15:22 | FAC | HFD | Xarm | n | Tumbleweed burning, no Xarm access!! | 15:24 |
| 15:40 | LAS | camilla | LVEA | YES | Laser HAZARD!! | 18:49 |
| 15:42 | ias | jason.ryanC.tyler | LVEA | n | FARO | 18:39 |
| 15:49 | ee | fil.marc | EY | n | accelerometers | 16:56 |
| 15:50 | tcs | tj.camilla | LVEA | YES | TCSx Table beam profiling | 18:27 |
| 15:50 | vac | gerardo.janos | LVEA | n | LOUD purge air +x-beam manifold test | 17:51 |
| 16:02 | pem | robert | ex | n | PEM Injections (set-up) | 20:12 |
| 16:16 | sus | rahul | cr | n | etmX+Y charge meas | 18:00 |
| 16:17 | ee | fernando | ex.ey.lvea | n | oplev cabling labeling | 18:08 |
| 16:25 | vac | norco | EY | n | LN2 @cp7 | 18:49 |
| 16:58 | vac | norco | Corner | n | LN2 @cp1 | 19:16 |
| 17:25 | fac | kim | LVEA | N | Technical cleaning | 18:36 |
| 17:52 | sqz | nutsinee, Daniel | sqz.rack | n | SQZ rack meas | 18:59 |
| 17:54 | sei | jim | LVEA | n | cps checks in CR & lvea | 18:15 |
| 18:03 | sus | jeff | cr | n | EX esd +charge offset | 18:51 |
| 18:21 | epo | cassidyand class! | CR | n | Field trip!!! | 18:31 |
| 18:30 | VAC | Gerardo | LVEA | - | Viewport notes | 19:10 |
| 18:32 | CDS | Marc | EY | n | Check on acc. cable | 19:16 |
| 18:38 | VAC | Janos | FCES | n | Purge | 18:39 |
| 19:02 | SQZ | Nutsinee | LVEA | n | SQZ rack meas. | 19:26 |
| 20:13 | PEM | Robert, Marc | EY | n | Acc. cable check | 21:20 |
| 21:46 | INJ | TJ | CR | n | Run detchar safety inj | 21:47 |
| 21:47 | ISC | Jenny | CR | n | PRM moves | 23:47 |
| 22:52 | PEM | Robert | LVEA | n | Turn on shaker | 23:02 |
| 22:59 | SQZ | Nutsinee, Naoki | FCES | yes | Center diode | 00:59 |