Displaying report 1-1 of 1.
Reports until 16:11, Wednesday 27 March 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:11, Wednesday 27 March 2024 (76745)
Ops Day Shift End

TITLE: 03/27 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing
INCOMING OPERATOR: Oli
SHIFT SUMMARY: We've been locked for over 4.5 hours and have just transitioned back to Observing for the rest of the evening. The one lock loss we had was possibly cuased by work on the floor. Relocking was straight forward, I ended up moving PRM to lock PRMI in an attempt to avoid an initial alignment. It took 57 min to relock.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:09 VAC Gerardo site n Forklifting septum from woodshop to LSB receiving 16:39
16:09 ISC Sheila, Artem CR n ESD bias change 18:09
16:26 ISC Daniel LVEA n Look at PSL racks 16:45
16:46 FAC Kim H2 n Tech clean 18:46
17:11 SQZ Julian OptLab yes SHG work 19:32
20:09 ISC Sheila LVEA n Checking on PSL racks 20:29
22:12 PEM Robert LVEA n Turn off amps, clean up 22:17
22:19 PEM Robert EX n Shaker meas 23:14
Displaying report 1-1 of 1.