Reports until 16:08, Tuesday 09 April 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:08, Tuesday 09 April 2024 (77066)
Ops Day Shift End

TITLE: 04/09 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Relatively quiet maintenance day, and recovery was fairly straight forward except for bad SRY sensor alignment (alog77064). We have wrapped up commissioning and are back to observing.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:04 ISC Jeff LVEA n OMC DCPD meas at rack 16:56
15:04 FAC Karen, Kim FCES n Tech clean 15:48
15:04 - Mitchell EX, EY n FAMIS checks 16:13
15:09 PSL Jason CR n Adjust pump diode current temp 15:55
15:12 IAS Tyler, Jason, Ryan C LVEA n Faro, RyanC in @ 16:15 18:36
15:12 VAC Jordan MY, EY n Turbo test 18:02
15:35 SQZ Daniel LVEA n SQZ rack meas 15:51
15:39 FAC Eric EX n Check on sensor 16:37
15:40 FAC Bubba LVEA n Dewpoint sensor 17:24
15:41 CDS Fil LVEA n PSL/IMC rack meas for SPI 17:28
15:48 FAC Karen EX n Tech clean 16:33
15:49 FAC Kim EY n Tech clean 17:21
15:54 VAC Gerardo LVEA n Check on h0lx computer 16:56
16:03 ISC/SQZ Daniel LVEA n IMC rack meas 16:19
16:47 SEI Jim, Mitchell LVEA n SEI rack organization and prep 18:36
16:50 FAC Eric MY,EY n Check glycol levels in mech room 17:17
16:54 VAC Janos FCES n Find Ken 18:59
16:59 SQZ Sheila, Jenny, Eric O CR n OMC scan 19:04
17:22 FAC Karen, Kim LVEA n Tech clean 18:39
17:23 FAC Chris FCES n FAMIS checks 18:19
17:29 CDS/ISC Sheila, Fil LVEA local Adjust refl camera, check connections 18:29
17:47 FAC Ken FCES n Electrical work 19:12
18:00 FAC Chris EX, EY n Looking for N2 tanks 18:56
18:01 SUS Camilla CR n Charge meas debugging 18:20
18:11 PCAL Rick PCAL lab local PCAL lab work ongoing
18:36 PSL Jason PSL encl local Dust monitor reboot, measure fiber 18:54
18:48 - Camilla LVEA n Sweep 19:08
19:48 FAC Ken FCES n Cable tray 21:48