Reports until 16:00, Wednesday 17 April 2024
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:00, Wednesday 17 April 2024 (77256)
OPS Day Shift Summary

TITLE: 04/17 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 126Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY:

IFO is in NLN and OBSERVING

Comissioning today went well. We survived a few high magntitude earthquakes.
 

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:14 FAC Karen Optics, Vac Prep Labs N Technical Cleaning 15:43
15:43 FAC Ken FC Enclosure N Electrical maintenance 16:43
15:44 FAC Karen MY N Technical Cleaning 16:44
17:17 FAC Fil CS Recieving Door N Roll up recieving door 18:17
21:16 SQZ Andrei, Sheila Optics Lab N Tour 22:16