TITLE: 04/18 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
The day started out with plans of coordinated-Commissioning but that soon changed after another earthquake took H1 down (so coordinated-commissioning was shifted to later in the morning) and a return to Observing in the afternoon.
LOG:
- 1502 Out Of Observing: Fix H1 + 8-11amLocal Commissioning
- 1502-1508 Transitioned to NO Squeezing & then back to FD Squeezing---this got the range up to almost 140Mpc.
- 1509 A2L measurement (sheila)
- 1522 Needed to reposition Picket Fences on nuc5
- 1524 Lockloss due to M5.6 earthquake in the Gulf of Mexico
- 1538 Rolling a big speaker across the LVEA + overall Injection set-up. Will be in/out. (Robert)
- 1624-1645 Initial Alignment (since PRMI looked bad)
- 1625-1639 Technical cleaning at H2 room (kim)
- 1705-1720 Amber tour
- 1725 Commissioning II
- 1837-1848 Robert Frost 5th grader tour (Cassidy, Maggie)
- 1928-1956 Pcal lab work (francisco)
- 1942 Test/Practice phone call received for a Test "Take Cover" received & stand down at 2011
- 2015 Pcal Lab work (tony)
- 2034 Back to OBSERVING
- 2118 MR Mezzanine for TCS rack photos (fil)
- 22:30 Ops Meeting!