Reports until 13:22, Saturday 20 April 2024
LHO General
corey.gray@LIGO.ORG - posted 13:22, Saturday 20 April 2024 (77304)
Belated Mid-Shift Report

Today is my first time being on shift to attempt a Saturday calibration  measurement, but have had a few wrinkles:

  1. h1 lockloss early in the shift; this is noteworthy because for the calib measurement you need to be thermalized (H1 has to be locked at high power for atleast 3hrs).
  2. When I was about 45min away from running the measurment, L1 had just recovered from their lockloss (so this resets the timers back to 3hrs again for L1 to thermalize).
  3. We are aiming to have a coordinated calibration measurement at 2200utc (3pm PDT).

No other notables for H1 from the shift