This morning Arnau ran another set of Transfer Functions for the H1 TMS EX, and after the measurements he gave the "GO AHEAD" that the system looked good to go. So, after SUS crew did work installing Vibation Absorbers, I went about staging ALL (6) TMS cables in coils on the ISI's Stage0. They now await Jim to dress them on the ISI.
Notes
-
Yesterday during cable testing, we discovered that the Green QPD's cable connector which connects to the BSC9 feedthru is missing set screws (so it can't be screwed into the feedthru). We'll probably try to fix this in-situ. This cable is D1000924 s/n S1104104 (as noted in table, here).
-
Size #18 caddis fly (i.e. a flying bug!) was observed on the ETMx quad (on cyllinder of penultimate mass). Jeff tried shooshing it away, but it ended up flying upstairs and we lost track of it.