Displaying report 1-1 of 1.
Reports until 16:19, Tuesday 23 April 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:19, Tuesday 23 April 2024 (77363)
Ops Day Shift End

TITLE: 04/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Started an initial alignment just after 1130 local time. Had no issues during the alignment, but when we tried to start main locking we would lose lock around the power up. This happened 4 times in total. Each lock loss would ring the violins up so we would have to damp them at 2 W. After the 3rd one during the time we were waiting for violins to damp, we ran some OLG of MICH P and DHARD P (the two channels we saw extra motion before the lock loss). This has us bump up the MICH P gain, but we lost lock again. We then decided to run the dark offsets and another initial alignment. Were currently noticing that initial alignment looks way off in MICH Bright and SR2 alignment. Working on that.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:01 FAC Ken, Fil LVEA n Cables by BSC3 16:50
15:02 CDS Dave CR n Model restarts and DAQ restart 15:15
15:05 FAC Tyler EY n Ladder inspections 15:49
15:10 FAC Karen,Kim FCES n Tech clean 16:28
15:34 PCAL Fransisco, Dripta EX Yes PCAL meas. 17:49
15:42 ISC Jeff LVEA n OMC electronics meas. @HAM6 racks 18:39
15:45 SEI Jim, Mitchell LVEA n Checking on 3IFO equipment 17:51
15:49 FAC Tyler LVEA n Talk with Jim 17:48
15:50 IAS Jason LVEA n Faro surveying 18:12
15:50 - Mike, Brian Smith LVEA n Tour, scouting 16:53
15:50 FAC Kim EX Yes Tech clean 17:02
15:51 FAC Karen EY n Tech clean 16:49
15:59 VAC Janos, Jordan, Gerardo EY, MY, MX, EX, CS, FCES n Pump cart wheels 18:20
16:03 - Betsy EY n Measurements 16:28
16:29 - Richard LVEA, FCTE, FCES n Check on cable trays, etc 16:53
16:50 FAC Ken FCES, FCTE n Cabel tray supports 21:51
17:18 FAC Chris, Eric EY, EX, CS n Axial fan lubrication 19:41
17:20 PEM Robert LVEA n Setup ground injector 18:07
17:23 CDS Marc CER n Accelerometer troubleshooting 17:50
17:32 FAC Karen, Kim LVEA n Tech clean 18:36
17:32 CDS Fil LVEA n Ground cable trays 18:28
18:05 SEI Jim EX, MX, EY, MY n Inventory search 19:05
18:08 PEM Robert EX n Shaker setup 18:45
18:13 - Mitchell Ends, Mech room n FAMIS checks 18:53
18:26 - Mike, Brian Smith OSB roof, Yarm, EY n Tour 20:24
19:11 PEM Robert LVEA n Setup meas. 19:51
22:17 PEM Robert CER n Check on electronics 22:29
Displaying report 1-1 of 1.