TITLE: 05/01 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 152Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Three lock losses and some commissioning time this moring. We plan to go out of Observing in an hour or two once we are thermalized to tune squeezer and take the calibration measurement that we couldn't run this morning.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:11 | SAF | LASER HAZARD | LVEA | YES | LVEA is LASER HAZARD | |
| 15:37 | PEM | Robert | LVEA | N | Turn on amps | 17:36 |
| 15:58 | FAC | Eric | FCES | N | Investigate a fan | 16:16 |
| 16:00 | VAC | Janos | MidY | N | Dewar pump | 16:31 |
| 17:27 | FAC | Karen | Woodshop, fire pump | N | Tech clean | 18:12 |
| 17:39 | PEM | Robert, Anamaria | EndX, Y | N | PEM tests | 19:35 |
| 18:13 | VAC | Travis | MX | N | Turbo pump pictures | 18:25 |
| 18:35 | PCAL | Rick | PCAL lab, Mech room | - | Looking for equipment | 20:19 |
| 20:20 | FAC | Chris | Mids | n | FAMIS checks | 21:00 |
| 21:25 | SQZ | Terry, Camilla | Opt Lab | Local | SHG work, new CO2 test | ongoing |
| 22:09 | PCAL | Rick, Fransisco | PCAL lab | local | PCAL tasks | ongoing |