Reports until 16:09, Wednesday 01 May 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:09, Wednesday 01 May 2024 (77544)
Ops Day Shift End

TITLE: 05/01 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 152Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Three lock losses and some commissioning time this moring. We plan to go out of Observing in an hour or two once we are thermalized to tune squeezer and take the calibration measurement that we couldn't run this morning.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:11 SAF LASER HAZARD LVEA YES LVEA is LASER HAZARD  
15:37 PEM Robert LVEA N Turn on amps 17:36
15:58 FAC Eric FCES N Investigate a fan 16:16
16:00 VAC Janos MidY N Dewar pump 16:31
17:27 FAC Karen Woodshop, fire pump N Tech clean 18:12
17:39 PEM Robert, Anamaria EndX, Y N PEM tests 19:35
18:13 VAC Travis MX N Turbo pump pictures 18:25
18:35 PCAL Rick PCAL lab, Mech room - Looking for equipment 20:19
20:20 FAC Chris Mids n FAMIS checks 21:00
21:25 SQZ Terry, Camilla Opt Lab Local SHG work, new CO2 test ongoing
22:09 PCAL Rick, Fransisco PCAL lab local PCAL tasks ongoing