TITLE: 05/03 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 133Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY:
H1 was in Observing the entire length of my shift.
H1 has been locked and Obsereving for almost 19 hours.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:11 | SAF | LASER HAZARD | LVEA | YES | LVEA is LASER HAZARD | 00:09 |
| 15:48 | FAC | Karen | Optics Lab | No | Technical Cleaning | 16:09 |
| 16:14 | VAC | Janos | Mid Y | N | Pump down Vac Jacket for N2 | 16:26 |
| 16:21 | PCAL | Francisco | PCAL Lab | Local | Upgrading the PCAL Lab | 19:39 |
| 16:27 | VAC | Janos & Jordan | FTCE Reciving | N | Checking Vac Equipment | 16:38 |
| 16:31 | Optic | Terry | Optics lab | Local | 2nd Harmonic generator work | 19:29 |
| 16:53 | FAC | Eric | FTCE | N | Working on Door latch to FTCE | 17:53 |
| 18:34 | TCS | Camilla & Jason | Optics lab | Local | Turning on the CO2 laser | 20:15 |
| 20:39 | SQZ | Terry & Co | Optics Lab | Local | 2nd harmonic Gen | 23:39 |
| 20:58 | PCAL | Francisco | PCAL Lab | Local | Setting up R&D on PCAL Lab system | 21:07 |
| 21:26 | FAC | Richard | PCAL Lab | Local | Plugging in & testing the new phone | 21:46 |
| 22:02 | PCAL | Francisco | PCAL lab | Local | Testing PCAL KVM | 01:02 |
| 23:13 | VAC | Janos & Jordan | Mid Y | N | Disasembly of CP3 | 23:43 |