LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 00:07, Saturday 04 May 2024 (77606)
OPS Eve Shift Summary

TITLE: 05/04 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 155Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:

IFO is in NLN and OBSERVING (26hr 46 min lock)

Violin Ring-Up:

From 04:40 UTC to 05:14 UTC, went in and out of observing to try to damp violin ETMX mode 9. The nominal gain did not work nor did testing different gains and (and turning on the angle filters). Checked the wiki/alog also but to no avail (initially went to the violins wiki page and Rahul's ppt to go to damp simple when Guardian was fighting me with gain issues). This violin has been growing slowly since the lock acquisition 26 hrs and 39 minutes ago. (screenshot). During this time, the violin count magnitude increased seven fold. Pinged Rahul and expecting help with it tomorrow.

SQZ Unlock:

Squeezer unlocked at 05:20 UTC but managed to relock at 5:29 UTC. I did have to play around with guardian states because guardian notified me that the SQZ ISS had saturated and to go to alog 70050 from May 2023. As I was playing around with the states, the SQZ relocked automatically. SQZ lockloss was potentially caused by a time corellated local earthquake that showed up on the EQ peak_outmon very sharply but was not high magnitude enough to cause us to go into EQ mode.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:11 SAF LASER HAZARD LVEA YES LVEA is LASER HAZARD 00:09
16:21 PCAL Francisco PCAL Lab Local Upgrading the PCAL Lab 19:39
16:31 Optic Terry Optics lab Local 2nd Harmonic generator work 19:29
18:34 TCS Camilla & Jason Optics lab Local Turning on the CO2 laser 20:15
20:39 SQZ Terry & Co Optics Lab Local 2nd harmonic Gen 23:39
20:58 PCAL Francisco PCAL Lab Local Setting up R&D on PCAL Lab system 21:07
21:26 FAC Richard PCAL Lab Local Plugging in & testing the new phone 21:46
22:02 PCAL Francisco PCAL lab Local Testing PCAL KVM 01:02
23:13 VAC Janos & Jordan Mid Y N Disasembly of CP3 23:43
Images attached to this report