Displaying report 1-1 of 1.
Reports until 08:05, Saturday 04 May 2024
H1 General (SUS)
anthony.sanchez@LIGO.ORG - posted 08:05, Saturday 04 May 2024 - last comment - 08:36, Saturday 04 May 2024(77607)
Saturday Ops Day Shift Start


TITLE: 05/04 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 151Mpc
OUTGOING OPERATOR: Ryan S
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 11mph Gusts, 7mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.09 μm/s
QUICK SUMMARY:

H1 has been locked and OBSERVING all night.
But the Violin ETMX mode 9 has been on the rise fore the past 34 hours! and is now very high!
I will be trying to damp this mode first thing!

Images attached to this report
Comments related to this report
anthony.sanchez@LIGO.ORG - 08:36, Saturday 04 May 2024 (77609)

Dropped to COMMISSIONING While trying to find the right setting to damp ETMX Mode 9.
While trying to turn the gain on the Viol Guardian was turning it off a second later. So i had to take the VIOLIN Guardian to DAMP_ON_SIMPLE (which dropped us from Observing) .
To resolve this Rahul had me edit the lscparams file , find the gain settign for that suspension and mode and set it to 0.
Then reload the Violin guardian and that allowed me to take the guardian to DAMP_VIOLINS_FULL_POWER and thus return to OBSERVING.
 Current settings for ETMX Mode 9 have the Violin mode going down.

EXm9: FM1, FM10  Gain: -1

 

Displaying report 1-1 of 1.