Reports until 11:19, Tuesday 07 May 2024
H1 SEI (SYS, VE)
jeffrey.kissel@LIGO.ORG - posted 11:19, Tuesday 07 May 2024 (77684)
HAM3 and HAM4 D8 Feedthrus are Indeed Free of Stuff
J. Kissel, J. Freed

We took a walk-about into the LVEA this morning and confirmed that the systems drawings for the HAM3 and HAM4 chamber feedthroughs (feedthrus, viewports) flange layouts -- D1002874 and D1002875, respectively -- are correct in that the top feedthrus are current not used, and have blanks installed. Pictures attached.

20240507_WHAM3_D8.jpg WHAM3 D8 (what we plan to use for HAM23 SPI Pathfinder [and CRS] optical fiber).

20240507_WHAM4_D8.jpg WHAM4 D8 (if a future HAM54 SPI link comes to fruition)
Images attached to this report