(Corey, Jeff G., Jim, Vincent)
o Jeff broke most of the helicoil tangs on the Optics Table.
o Measurements were made on the (3) Stage0 Blade Posts with the Romer Arm.
o Blade Posts were installed on Stage0 (although they couldn't be torqued down because we didn't have a socket for these BIG 5/8" socket head cap screws).
o Continued wrapping/bagging/tagging HAM parts, to clear room for BSC parts.