Displaying report 1-1 of 1.
Reports until 16:28, Tuesday 07 May 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:28, Tuesday 07 May 2024 (77702)
Ops Day Shift End

TITLE: 05/07 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 147Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Lighter maintenance today but we managed to do some more SR3/2 moving to investigate our recent required alignment shift. On the relock we had some lock losses that had to be fixed with some filter changes (alog77698). Violins have also come up during these relocks, but they are damping nicely. We are now observing for almost an hour.
LOG:

2240 Observing                                                                                              

Start Time System Name Location Lazer_Haz Task Time End
14:57 VAC Gerardo LVEA n Tubro pump functionality tests 15:34
14:57 FAC Ken LVEA, FCTE n Cable trays 20:35
15:03 VAC Jordan MX n Setup CP6 dewar pump 15:31
15:07 FAC Karen, Kim FCES n Tech clean 15:40
15:12 - Mitchell EX, EY n Hepi, dust pump checks 15:54
15:17 SQZ Fil, Camilla LVEA local TTFSS chassis swap 15:46
15:17 CDS Jonathan - n nds1 restart 15:32
15:34 VAC Janos, Jordan, Travis, Fil FCES n HV cable install for ion pumps 18:34
15:34 FAC Chris LVEA, outbuildings m Pest escort and FAMIS 17:53
15:41 FAC Kim EX n Tech clean 17:17
15:41 FAC Karen EY n Tech clean 16:39
15:48 CDS Fil EX n PCAL interlock inspection 17:00
15:54 SQZ Terry Opt Lab local SHG work 17:51
16:04 - Jeff, Josh, Kar Meng LVEA n Tour 17:24
16:13 FAC Tyler EX n Mac Miller fan bearing repair 23:25
16:40 VAC Gerardo LVEA n Turbo pump check 16:58
16:49 - Richard LVEA n Walk about 17:08
17:16 CDS Marc EY, MY, MX, EX n Power supply listening 18:15
17:52 FAC Karen, Kim LVEA n Tech clean 18:46
17:56 VAC Gerardo LVEA n Turn off turbos 18:04
18:48 TCS Camilla LVEA n Grabbing mirror mounts 18:58
18:59 SQZ Terry, Kar Meng Opt Lab local SHG work 21:03
20:53 TCS Camilla Opt Lab local CO2 testing 22:53
21:51 SQZ Kar Meng Opt Lab local SHG work 23:04
22:08 VAC Janos, contractor MX n Tour of vac system at MX 00:08
Displaying report 1-1 of 1.