Ops Day Shift End

TITLE: 05/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Locked for 10.5 hours before a sudden lock loss just happened. There was some commissioning time this morning which bumped our range up a bit, so hopefully when Corey gets it back up we will be back above 160 again.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:06 VAC Janos, Jordan MX n CP dewar pumping 16:51
16:07 SUS Camilla, Erik remote n ITMX awg testing 16:51
16:07 SQZ Sheila, Andrei CR n SQZ meas. 19:14
16:52 FAC Tyler, Eric EX n Chiller yard alarm investigation 17:11
21:38 SQZ Terry, Kar Meng Opt Lab local SHG work 23:32
23:30 vac jordan.janos mx n turning off cp5 pump 01:00