TITLE: 05/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Oli
SHIFT SUMMARY: SQZ issues were fixed this morning so H1 has recovered some range since last night. Two locklosses today, but otherwise quiet. H1 is currently relocking at ACQUIRE_DRMI.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 16:57 | FAC | Kim | H2 | n | Technical cleaning | 17:14 |
| 18:20 | AOS | Betsy, Mitchell | Opt Lab | n | Checks | 18:31 |
| 22:00 | SQZ | Kar Meng | Opt Lab | n | Checking equipment | 22:12 |