Reports until 12:30, Tuesday 17 September 2013
X1 General
james.batch@LIGO.ORG - posted 12:30, Tuesday 17 September 2013 (7779)
Staging building timing fanout issues
The optical timing distribution system in the staging building is no longer in sync with the master timing in the MSR.  Because of this, the GPS time of the models running on the test stands is off by a second or two.  This should be fixed at some point when it is convenient to shut down the models and troubleshoot the system.  Until then, the system should work so this repair is not urgent.

This affects both seismic and suspension test stands in the staging building.