Reports until 07:33, Wednesday 15 May 2024
LHO General
corey.gray@LIGO.ORG - posted 07:33, Wednesday 15 May 2024 (77848)
Wed DAY Ops Transition

TITLE: 05/15 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Ibrahim
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 9mph Gusts, 6mph 5min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.10 μm/s
QUICK SUMMARY:

Walked in to h1 locking PRMI (there was a lockloss 25min earlier (at 1405utc).

I believe Commissioning is in the morning today (along with a calibration measurement), but H1 will be thermalizing the next few hours.

Green arm x power is looking back to normal-ish with power closer to 1.0.
(Also there was  box with a bat in it outside the entry to the Control Room.)