H1 CAL (CAL)
corey.gray@LIGO.ORG - posted 15:36, Wednesday 15 May 2024 (77850)
Wednesday H1 Calibration Measurement Run (broadband headless + simulines)

After coordinating with LLO & notifying Virgo, went with running the Wednesday Calibration Measurements (broadband [~5min] + simullines [~23min]) at ~ 21:10UTC

Logistical Notes In Intersite Coordinating:  At 2007utc (107pmPDT) contacted LLO Control Room via Teamspeak and JoeB/Anamaria wanted another hour so they could also have atleast 3hrs of thermalization.  So will connect with LLO at 2110utc to coordinate our down time for our Wednesday calibration measurement.  Then contacted the Virgo control room via teamspeak to give them a heads up for possible down time at 2110utc.

Measurement NOTES:

Images attached to this report