After coordinating with LLO & notifying Virgo, went with running the Wednesday Calibration Measurements (broadband [~5min] + simullines [~23min]) at ~ 21:10UTC.
Logistical Notes In Intersite Coordinating: At 2007utc (107pmPDT) contacted LLO Control Room via Teamspeak and JoeB/Anamaria wanted another hour so they could also have atleast 3hrs of thermalization. So will connect with LLO at 2110utc to coordinate our down time for our Wednesday calibration measurement. Then contacted the Virgo control room via teamspeak to give them a heads up for possible down time at 2110utc.
Measurement NOTES:
- Following instructions (link)
- H1 will be thermalized at around 2000 UTC, but will wait for L1 to thermalilze & start at 2110utc.
- 21:10:06 ISC LOCK to NLN_CAL_MEAS
- Calibration_Monitor medm screenshot is attached
- 2110 - 2106 Broadband measurement run
- Measurement at: /ligo/groups/cal/H1/measurements/PCALY2DARM_BB/
- 2114 - 2137 Simullines measurement
- gps START time: GPS: 1399842963.971634
- gps END time: GPS: 1399844255.440947
- Files writtten to subfolders here: /ligo/groups/cal/H1/measurements
- Not sure how long it takes for the pydarm report to post from the H1 Calibration webpage, but will try attach a pdf of the pydarm report if it loads before my shift ends.