TITLE: 05/19 Eve Shift: 2300-0800 UTC (1600-0100 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 22mph Gusts, 19mph 5min avg
Primary useism: 0.12 μm/s
Secondary useism: 0.10 μm/s
QUICK SUMMARY:
Took the IMC OFFLINE
heading to the CER> HAM3 ISI Interface chassis, on the back of those 2 chassis , power cycling both the interface chassis.
After Power cycling and getting approval from Jim I starting relocking, which was failing to get past PRMI. I then did an Initial_ALignment. This is when an earthquake struck.
https://earthquake.usgs.gov/earthquakes/eventpage/us6000mzjx/
Initial Alignment did finish. I waited a few minutes for the peak of the earthquake to go down before starting to lock again.
Locking went well after this, even with wind speed rising and earthquakin.
Observing Reached @ 1:45 UTC
We are now Locked and in Observing, Range is slight low though, once thermalized I'll do a SQZ Scan.