Reports until 16:29, Monday 20 May 2024
H1 General
ryan.crouch@LIGO.ORG - posted 16:29, Monday 20 May 2024 (77941)
OPS Monday day shift summary

TITLE: 05/20 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 147Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Lost lock during commissioning, relocking was straightforward and unassisted after finishing the manual IA after the PR3 moves. We've been locked for 2:15 as of 23:30 UTC

16:00 UTC  We started commissioning

18:45UTC lockloss from commissioning activities

18:46 UTC Manual IA

19:22 UTC Another PR2_SPOT_MOVE

19:41 UTC 2nd Manual IA

While relocking we paused in PRMI to run OLG measurements of MICH and PRCL

21:19 UTC back in Observing after accepting/reverting some SQZ diffs

From the DARM_coherence_checks.xml template it looks like MICHFF needs to be re-tuned

21:36 UTC Superevent S240520cv

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:46 FAC Karen Optics and VPW N Tech clean 15:15
15:46 FAC Kim MidX N Tech clean 16:38
15:47 FAC Karen MidY N Tech clean 17:26
18:46 CAL Francisco PCAL lab LOCAL PCAL work 19:29
22:19 CAL Francisco PCAL lab LOCAL PCAL work 22:49
Images attached to this report