TITLE: 05/21 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Maintenance activities were light, but the was some work to try and get the PR2 spot moved closer to the center that had some alignment consequences. We have been trying to recover the IFO since the moves but unable so far. Right now Jenne is working to revert us back to our configuration we were in last night and then we can try with that.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:58 | FAC | Chris | EY | n | Bringing lift to EY (started near CS @~740) | 16:58 |
14:59 | FAC | Karen | EY | n | Tech clean | 16:17 |
14:59 | fAC | Kim | EX | n | Tech clean | 16:17 |
15:03 | FAC | Ken | LVEA | n | Cable tray install BSC1 | 19:03 |
15:06 | VAC | Jordan | FCES | n | Grab parts | 15:19 |
15:29 | CDS | Erik | - | n | Wifi IOC restart | 15:32 |
15:33 | CDS | Erik | MY,MX | n | Wifi access point work | 18:50 |
15:36 | PCAL | Francisco, Minyo | EX | YES | PCAL spot move | 17:29 |
15:46 | VAC | Travis | LVEA | n | Measurements of equipment near FCT | 16:35 |
16:11 | FAC | Bubba, Betsy, Apollo | EY, LVEA | n | Scaffolding check (d module) | 17:32 |
16:12 | IAS | Jason, Ryan C | LVEA | n | move Faro back to W bay | 17:50 |
16:30 | FAC | Christina | MX,MY | n | Property tags | 17:59 |
16:33 | FAC | Kim, Karen | LVEA | n | Tech clean | 18:13 |
16:36 | - | Mitchell | EY,EX | n | FAMIS tasks | 16:37 |
17:30 | VAC | Travis | LVEA | n | Measure equipment | 17:38 |
17:40 | CDS | Marc | EY | n | Power supply temp checks | 18:02 |
18:13 | FAC | Karen, Kim | FCES | n | Tech clean | 18:42 |