TITLE: 05/23 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Calibration sweep and then some commissioning time today. A lock loss ended a 26 hour lock. We then move the PR2 spot back to our previous position >8 days ago. We just finished that move and now Ryan is starting an alignment.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:27 | PCAL | Francisco, Tony | PCAL lab | local | Lab measurements (Tony out 18:30) | 19:01 |
22:02 | PCAL | Tony, Dripta | PCAL Lab | local | Lab measurements | 00:02 |