Reports until 16:30, Tuesday 28 May 2024
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:30, Tuesday 28 May 2024 (78101)
OPS Day Shift Summary

TITLE: 05/28 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Corey
SHIFT SUMMARY:

IFO is in LOCKING at LOCKING_ARMS_GREEN.

We acquired NLN earlier but lost lock while some last min SQZ maintenance was being done. We lost lock from LOWNOISE_COIL_DRIVERS at 23:23 UTC and the wind is really picking up now (40mph gusts).


LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:45 FAC Ken LVEA N Conduit work 19:01
15:00 FAC Kim EX N Tech cleaning 16:08
15:03 VAC Jordan MX, EX N Turbopump Tests 17:16
15:10 PCAL Tony, Dripta EY Y Transitioning to Laser Hazard, PCAL Calibration 18:08
15:11 SYS Jeff LVEA Y OMC Electronics Characterization 17:30
15:12 SAF LVEA LVEA YES LVEA IS IN LASER HAZARD 18:04
15:19 IAS Tyler LVEA Y Faro Work 19:10
15:24 TCS TJ LVEA Y Realigning HWS Corner System 16:36
15:26 IAS Ryan C LVEA Y Faro Work 19:12
15:31 VAC Travis EY Y Install decoupled cooling lines on EY Turbo Station 19:00
15:38 PSL Jason, Ryan S PSL Enclosure Y Investigating PSL slow increase in PMC reflected power 18:04
15:41 TCS Camilla LVEA Y Realigning HWS Corner System 16:35
15:46 ISC Richard, Fil EX, EY (not VEAs) N Temp unplug of IRIG-B Signal from ADC 16:18
15:54 FAC Chris LVEA Y Chat with Tyler 16:11
15:54 FAC Karen EY Y Technical Cleaning 15:54
15:58 ARCH Archeologist MY Chiller Yard N APE Check (Area of Potential Effect) 17:15
15:58 VAC Gerardo LVEA Y Pulling Cable 19:07
16:06 PCAL Francisco EY Y Grabbing Laser Gogges 16:33
16:07 PEM Robert LVEA Y Comissioning test setup 18:40
16:12 FAC Chris, Eric Mechanical Rm N Replacing Fan Bearing 19:12
16:23 EE Fil LVEA, CER N IO Chassis Inspection, Helping VAC 19:15
16:33 SEI Jim LVEA Y Electronics work by HAM7 19:05
16:34 PCAL Francisco EX Y PCAL Spot Move 18:26
16:42 FAC Karen, Kim FCES N Tech Cleaning 17:11
16:50   Terry Optics Lab N Optics Lab Work 18:57
17:16 ARCH Archeologist, Richard EY Beam Tube N APE 17:57
17:17 VAC Jordan LVEA Y Helping Gerardo pull cables 19:07
17:31 SYS Jeff, Preet LVEA N OMC Electronics Characterization Pt 2 18:59
17:41 VAC Janos, Isaiah LVEA N Pulling Cables 19:07
18:04 IAS Jason LVEA N Faro Work 19:12
18:21 PCAL Tony PCAL Lab Local Responsivity ratio measurement 18:49
18:36 EE Marc LVEA N Unplugging (after talking to Fil in LVEA) 18:52
19:13 OPS Ryan C LVEA N LVEA Sweep 19:24
20:04 VAC Janos, Isaiah MY N Tour 21:04
20:23 PCAL Tony PCAL Lab N Measurements 22:43
20:52 CAL Terry Optics lab Y SQZ work 23:15