Reports until 20:24, Tuesday 28 May 2024
H1 CAL
francisco.llamas@LIGO.ORG - posted 20:24, Tuesday 28 May 2024 (78107)
Pcal XY comparison investigation - third movement, inner beam down

FranciscoL, [Remote: RickS]

After one week of moving the inner beam to the center of the Rx (alog 77967), on May 28, we moved the beam down. This completes a cycle in which we characterize the XY comparison value to both directions of the pcal beam movement - one side right, one side down.

Attachment 'BothBeamsBefore' shows the beams before making any changes. Attachment 'AlignedTarget' shows the alignment with the beam height gauge. The pdf 'EndStationLog.pdf' lists the voltage values after each significant step of procedure T2400163. The steps represent writing down a voltage value after a particular change of the system. Some steps were recorded multiple times after minor changes.

The voltage ranged by ± 0.01 V during the measurement, mostly noticed when the target is placed on the integrating shpere. We might need to look closer at the seismic isolation configuration to reduce the noise during this - and potentially also end station - measurement procedure.

The 'Initial' measurement is *equal* to the last voltage measurement from the previous movement, done on May 21 (alog 77967). The initial and final voltage measuremed during todays procedure did not change.

With the movement made today, we expect that the X/Y comparison will change by +21.15 HOPs.

Images attached to this report
Non-image files attached to this report