Reports until 16:41, Wednesday 29 May 2024
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:41, Wednesday 29 May 2024 (78130)
OPS Day Shift Summary

TITLE: 05/29 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 145Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY:

IFO is in NLN since 17:45 UTC

IFO States for the day has been:

14:25 UTC: OBSERVING

14:45 UTC: Lockloss - after initial alignment, we went into planned comissioning from 16:00 UTC to 19:00 UTC. IFO stayed in down during this time for comissioning tasks. After these, we began to lock again.

17:45 UTC: Reached NLN and went into COMISSIONING

19:11 UTC: OBSERVING after comissioning tasks wrapped up

20:30 UTC: COMMISSIONING impromptu comissioning time coinciding with LLO since neither site had a fully locked IFO during the original alotted time. An hour of comissioning time was agreed upon.

21:34 UTC: OBSERVING

23:30 UTC: Shift End - OBSERVING


LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:53 SYS Jeff LVEA N Grabbing 786 by HAM6 16:02
16:02 FAC Karen MY N Technical Cleaning 16:02
16:03 FAC Kim MX N Technical Cleaning 16:51
18:22 SAF Ryan LVEA Y Transition to laser hazard 18:38
18:23 PEM Robert LVEA Y Stray beam force measurements 19:11
19:13 SAF LVEA IS LASER HAZARD 05:53
20:41 PEM Robert LVEA Y Stray beam force measurements 21:28
21:04 TCS Camilla Opt Lab Local CO2 laser testing 23:04
21:04 SEI Mitchell, Jim MX N Looking at in-air cables 21:40
23:09 TCS Camilla, Terry Opt Lab Local CO2 Laser Testing 02:10