H1 General
andres.ramirez@LIGO.ORG - posted 15:59, Friday 20 September 2013 (7822)
Ops shift Summary

Cabling at End X – Corey
Work on Seismic Coil Driver at End X –Filiberto
Squeezer area Transitioned to Laser Safe  status  - Alexa
Annulus Ion pump work by BSC2 – Kyle
Floor repair at End Y - Craftman
Getting Baffle parts ready for installation at LVEA – Thomas/Gerardo/G2