Displaying report 1-1 of 1.
Reports until 16:36, Monday 03 June 2024
H1 General
oli.patane@LIGO.ORG - posted 16:36, Monday 03 June 2024 (78223)
Ops Day Shift End

TITLE: 06/03 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Wind
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Still working on relocking and at LOCKING_ALS. We recently had gotten up to CARM_OFFSET_REDUCTION.
LOG:

14:30 Detector Observing and Locked for 6 hours

15:27 Lockloss https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=78202
    - PSL ISS diffracted power low, so I moved REFSIGNAL up by 0.01
    - Having issues locking ALS because of the wind picking up
    - 10 locklosses from LOCKING_ALS
    - 1 lockloss from FIND_IR
16:18 Holding in DOWN for a bit
16:28 Starting to relock again
    - 3 locklosses from ALS
16:35 Back to DOWN - going to have to sit here for a while
    - Some maintenance tasks are going to be done
17:59 Trying relocking again again
    - Lockloss from CARM_150_PICOMETERS
    - Lockloss from POWER_10W
    - (many) locklosses from LOCKING_ALS
    - Lockloss from CARM_150_PICOMETERS
20:21 Put in DOWN
21:49 Retrying relocking
    - Lockloss from CARM_OFFSET_REDUCTION                                                                         

Start Time System Name Location Lazer_Haz Task Time End
15:20 FAC Karen VacPrep, OptLab n Tech clean 15:52
15:53 FAC Karen MY n Tech clean 17:23
15:54 PEM Robert EX n Bringing back injection equipment 16:04
16:08 FAC Kim LVEA Receiving y Grabbing garb 16:11
16:08 PEM Robert LVEA yes Setting up tests 17:55
16:09 PCAL Tony PCAL Lab y(local) Starting measurement 18:17
16:20 FAC Kim MX n Tech clean 16:55
16:31 PCAL Rick PCAL Lab, OptLab y(local) PCAL work 18:18
16:43 TCS TJ, Robert LVEA yes Check out TCS electronics 17:58
16:44 PSL Jason, RyanS CR n Touch up PMC alignment 17:28
16:52 EE Fil LVEA yes Checking out failed dust monitor cables 17:58
17:31 ISC Sheila, Jennie CR n bounce measurements 18:17
17:36   Terry OpticsLab y(local) SHG 18:31
19:18 PEM Robert LVEA yes Taking photos 19:35
20:15 VAC Travis MY n Picking up parts 20:28
21:05 TCS TJ LVEA yes Putting terminator on output 21:15
21:31   Terry OpticsLab yes(local) SHG 22:24
21:46 AC Gerardo LVEA yes Checking work 22:03
23:00 PEM Robert LVEA yes Mounting an accelerometer 23:51
Displaying report 1-1 of 1.