Displaying report 1-1 of 1.
Reports until 16:30, Thursday 06 June 2024
LHO General
ryan.short@LIGO.ORG - posted 16:30, Thursday 06 June 2024 (78285)
Ops Day Shift Summary

TITLE: 06/06 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Since my midshift report (alog78281), efforts have been focused on trying to find optimal alignment into the OMC with this new spot position in the OFI. Work on this is ongoing, with the current plan being to use picomotors to adjust the pointing onto PDs in HAM6 to then give more range with OM mirrors to direct light into the OMC.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
21:03 SAF HAZARD LVEA YES LVEA is Laser HAZARD Ongoing
14:40 FAC Tyler, Eric EY N Picking up cooler 15:40
15:14 FAC Karen Opt Lab N Technical cleaning 15:37
15:42 PEM Robert LVEA - Taking viewport pictures 17:03
16:40 FAC Kim H2 N Technical cleaning 16:51
17:00 SQZ Terry Opt Lab Local SHG work 19:36
17:08 ISC Sheila, TJ, Jennie CR N OFI spot move 20:08
17:36 PEM Robert LVEA - Turning on shaker amp 18:26
20:49 CAL Jeff CER N Checking electronics 20:51
21:26 SQZ Terry, Kar Meng Opt Lab Local SHG work Ongoing
23:12 CAL Francisco PCal Lab N Measurements Ongoing
Displaying report 1-1 of 1.