TITLE: 06/06 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Since my midshift report (alog78281), efforts have been focused on trying to find optimal alignment into the OMC with this new spot position in the OFI. Work on this is ongoing, with the current plan being to use picomotors to adjust the pointing onto PDs in HAM6 to then give more range with OM mirrors to direct light into the OMC.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 21:03 | SAF | HAZARD | LVEA | YES | LVEA is Laser HAZARD | Ongoing |
| 14:40 | FAC | Tyler, Eric | EY | N | Picking up cooler | 15:40 |
| 15:14 | FAC | Karen | Opt Lab | N | Technical cleaning | 15:37 |
| 15:42 | PEM | Robert | LVEA | - | Taking viewport pictures | 17:03 |
| 16:40 | FAC | Kim | H2 | N | Technical cleaning | 16:51 |
| 17:00 | SQZ | Terry | Opt Lab | Local | SHG work | 19:36 |
| 17:08 | ISC | Sheila, TJ, Jennie | CR | N | OFI spot move | 20:08 |
| 17:36 | PEM | Robert | LVEA | - | Turning on shaker amp | 18:26 |
| 20:49 | CAL | Jeff | CER | N | Checking electronics | 20:51 |
| 21:26 | SQZ | Terry, Kar Meng | Opt Lab | Local | SHG work | Ongoing |
| 23:12 | CAL | Francisco | PCal Lab | N | Measurements | Ongoing |