Reports until 07:40, Sunday 09 June 2024
LHO General
corey.gray@LIGO.ORG - posted 07:40, Sunday 09 June 2024 (78324)
Sun DAY Ops Transition

TITLE: 06/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: n/a
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 6mph Gusts, 3mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.23 μm/s
QUICK SUMMARY:

H1 was in the SDF Revert state (took to READY) overnight.  Continue to be in the holding pattern of not going with more than 10W in power until approved. 

IMAX crew continuing with set-up work.

There was a 6.2 earthquake down along the Pacific/Antartic Ridge about 5hrs ago.