corey.gray@LIGO.ORG - posted 16:32, Sunday 09 June 2024 (78325)
Sun DAY Ops Summary

TITLE: 06/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Tony
SHIFT SUMMARY:
 Tried to be better at noting main items in the alog today, but overall, we have received the OK for high power work from Jenne/Mike.  With this, spent most of the day with Keita remotely, Sheila via chat, and then Jenne joined remotely.  Have made it past 60W a few times, but have an issue at LOWNOISE LENGTH CONTROL.  The last hour or so H1 has had locklosses in early steps around DRMI and earlier, so Tony started an alignment.

The COSMIC film crew has been busy with set-up in the MPR, Roof, and Control Room.  (Richard and Mike have been working with them.)