TITLE: 06/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 127Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY:
For the morning H1 was in Observe (from Tony at 2am!) and shortly later we transitioned to Commissioning. (much of this occurring under a glow of blue light from the visiting film crew!)
The film crew completed multiple shots of Nergis, and filmed interviews with Sheila, Ibrahim, and Corey. And we had lots of extras in the Control Room as well. This work was mostly done after 1pm (they then moved to the Staging Building, LExC (early eve), and other shots?).
LOG:
- Film Crew has been in/out the site since atleast 730am; For the Control Room we had studio lighting starting at 845amLOCAL and filming in the Control Room
- 1455-1507 Addressing a fan near Filter Cavity End Station, no entry into main room (eric)
- 1458-1523 Optics Lab/Vacuum Prep technical cleaning (karen)
- 1520-1554 X1 Tube set-up for film crew & grabbing a fan (Tyler, eric)
- 1535-1855 Started to take (3) violin modes which weren't at their NOMINAL value (ETMy [Mode 1&4], ETMx [Mode 8], & ITMx [Mode 8 & 9]) back to their NOMINAL settings (corey)
- 1550 Out of Observing for COMMISSIONING
- 1550 Squeezer Alignment (naoki)
- 1557 & 1705 A2L meas (jenny)
- .1630 Making a filter change (sheila)
- 1833 Back to OBSERVING
- 1606-1735 MY cleaning (karen)
- 1617-1700 MX cleaning (kim)
- 2035 PCal work for much of the afternoon--with a lunch break (francisco)
- 2109-2142 Drone test flights around OSB parking lot (richard)
- 2247 SHG green beam work in optics lab (terry)
- 2253 Incoming M5.1 earthquake from east Pacific Rise