Reports until 16:30, Tuesday 11 June 2024
LHO General
thomas.shaffer@LIGO.ORG - posted 16:30, Tuesday 11 June 2024 (78379)
Ops Day Shift End

TITLE: 06/11 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Wind
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Longer maintenance day today, with activities wrapping up an hour or two ago. We've made it through initial alignment but there was no green light in the arms when Oli and I first started locking. We ran the baffle align scripts for the TMS and ITMs but ended up finding the arms by hand. The rest of initial alignment was hands off. The wind has increased and ALS is now having a rough time staying locked, so we'll see how the rest of locking goes.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
21:03 SAF HAZARD LVEA YES LVEA is Laser HAZARD 15:46
15:09 VAC Jordan LVEA n Setup RGAs on output arm 18:11
15:10 FAC Karen, Kim, Nelly LVEA n Tech clean 16:18
15:14 VAC Gerardo LVEA n Input tube AIP work (climbing on tube) 16:31
15:15 CDS Erik EX n ADC install 15:53
15:19 SAF Oli LVEA n Transition LVEA to laser SAFE 15:53
15:21 IAS Jason, TJ O., Tyler, Ryan C LVEA yes FARO work 21:58
15:28 Film Mike, Richard, film crew LVEA YES Filming 22:47
15:32 OMC Jeff LVEA - HAM6 - DCPD electronics testing 19:39
15:51 CDS Erik, Fil EX n Add ADC to h1iscex 16:18
15:52 DAQ Dave remote n DAQ RESTART for EX work 16:21
15:52 VAC Janos, Isaiah EX, LVEA n Pump testing 17:34
15:54 FAC Ken LVEA n Cable tray install on FC tube area 18:27
16:08 FAC Chris LVEA, FCES, EX, EY n FAMIS tasks 18:00
16:10 PEM Sheila LVEA n Magnetometer move 16:10
16:21 CDS Fil, Marc EY n Reconnect IRIGb, install PEM AA chassis but not plug in 17:01
16:32 VAC Norco EY n CP7 fill 19:24
16:36 VAC Travis MX, EX n Turbo testing 19:24
17:11 SEI Jim Ends n Look for regulator 18:18
17:19 FAC Kim EX n Tech clean 18:18
17:20 FAC Karen, Nelly EY n Tech clean 18:11
17:44 PCAL Francisco EX LOCAL PCAL meas. 19:34
17:58 SAF HAZARD EX YES EX is Laser HAZARD 19:34
18:11 VAC Norco CS n CP2 fill 20:04
18:14 VAC Gerardo, Jordan, Fil, Marc LVEA n Pull cable from Y BM to mech room 18:57
19:00 VAC Janos, Isaiah EX yes Pump testing 20:28
19:09 CDS Fil High bay n Clearing out for genie lift to fit 19:36
19:21 SQZ Kar Meng Opt Lab local SHG work 20:05
19:46 CDS Jonathan, Jamie, Dan Remote n GDS/DMT restarts 20:59
21:48 VAC Gerardo LVEA yes Looking at VPs 22:12
21:54 VAC Janos EX n AIP check 22:12
23:13 Film Film crew FCTE n Filming the FCTE 00:13