Karen and Cris did a very thorough cleaning this morning. Bubba, Randy and Scott headed down after lunch. The hard cover and the dome were removed from BSC9. (The dome is sitting on the SEI Storage Container pallet on clean Al blocks.) Walking plates were flown to the Work Platform, to be wiped down prior to installation. The SEI sock was installed.